By: Michael Horoho | Date: 07/31/2026 01:20:55 PM
A large limb fell on the footbridge next to the playground and broke several railings and couple of boards on the floor of the bridge. We blocked both ends of the bridge with orange snow fence. The bridge is closed until the limb is removed and broken railings and boards are repaired.
Thanks!
TSW H.O.A.
